Main Process Bullets and timelines:
-
Draft-5
of SV3.1 LRM was made available on Friday February 27th. It was
parked under: http://www.eda.org/sv/SystemVerilog_3.1a_draft5.pdf
-
By March 10th: Committee members to review draft-5 and send comments or corrections
into sv-bc. Only editorial comments are considered.
-
on March 10th - Johny and Karen will prepare a list and send to David Smith (owner of
the LRM)
-
If
the amount of issues that were found during the review period (ending by March
10th) is sufficient, a Draft-6 shall be created including these
changes.
-
Any
requested changes made after March 10th shall not be accepted
-
Voting
on Draft-5 and proposed
changes will occur in our meeting at March 15th. This
allows 5 days period for the review and voting to occur.
-
Only
qualified voting members are
eligible to vote.
-
On March 31st - TCC will provide recommendation to Accellera board
-
On April 15th - Accellera board ill complete the voting and approve SV3.1A as an
Accellera standard
-
On April 8 - all
editorial changes will be added to the final LRM of 3.1A. This version will be
released on April 15.
-
Between April 8 through June 1st, SV committees will continue to collect feedback
(Errata and Enhancement):
o
Errata
will be released on bi
o
Errata
list will be released separately from the original Standard. We will have
versions attached to it.