Subject: [sv-ec] Agenda for SV-EC 1 Dec 2003 Meeting.
From: David W. Smith (David.Smith@synopsys.com)
Date: Wed Nov 26 2003 - 11:26:47 PST
Greetings,
There will be a meeting of the SV-EC committee on Monday, 1 December 2003.
Please note that I have allocated time for each stage of the meeting. This
will encourage us to start the meeting on time.
This is an extra meeting. Please note that the meeting time is from 12:00pm
until 1:00pm PST
NOTE: Please note the long list of erratum. Assuming we make it through the
bitstream proposal as planned we will work through the errata list
(hopefully the uncontroversial ones first).
Call-in information is available at:
<http://www.eda.org/sv-ec/Minutes.html#Meeting_Schedule>
http://www.eda.org/sv-ec/Minutes.html#Meeting_Schedule and is:
(888) 635.9997 - US - Toll free
(763) 315.6815 - International - Toll
Participant code: 5476467
The agenda for Monday is:
1. Review of the meeting minutes (5 Minutes)
http://www.eda.org/sv-ec/Minutes/SV-EC-Minutes-2003-November-24.txt
2. Review of open Action Items (2 Minutes)
AI-18 (Unassigned): Create appendix for built-in standard package:
Assign owner
3. Review of Inter-committee dependencies (10 minutes)
OCR-2: Discussion on inside proposal from SV-BC
OCR-3: Sequential constraints
4. Review 3.1a Extensions and discussion (50 minutes)
Complete review of:
EXT-12: Bitstream support ( minutes)
5. Review Errata list (55 Minutes)
Proposals:
ERR-50 (Arturo): Program visibility rules
ERR-51 (Brad): Method calls and class parameter overrides
ERR-55 (Ray): Remove use of priority in constraint block
ERR-53 (Arturo): Add BNF for virtual interface declaration usage
ERR-54 (Arturo): Split 19.8.2 into 19.4.5 and 19.8.2
ERR-4 (Arturo): automatics in fork/join_none
ERR-44 (Jay) Consolidation of implication operators
ERR-52 (Arturo): Events used within coverage are immediate
ERR-45 (Dave): Wildcard equality
No Proposals:
ERR-8 (Dave) Using event control with methods
ERR-20/21 (Arturo) Update of example based on ERR-4
ERR-47 (Brad) Keywords as identifiers
ERR-56 (David) Fix all locations in LRM for built-in package to use
std::
7. Meeting logistics (2 minutes)
December 8
Start LRM editorial review
Regards
David
This archive was generated by hypermail 2b28 : Wed Nov 26 2003 - 11:29:00 PST