To all P1800 Technical Committees,
Last week there was a Working Group conference call. During that meeting
a schedule update was agreed to for the remaining work in the Technical
Committees.
The following was agreed to:
1. No new mantis items are allowed to be worked on.
Only those mantis items shown in the following list are allowed to be
worked on.
sv-ac
3564 Sec 9.2.2.2.1 needs to clarify whether variables read in an assertion
3145 Need to clearly define "maximal property"
2476 Need clarification about system functions $onehot, etc
2093 Checker construct should permit output arguments
3033 Enhance checker modeling capabilities
3213 Update definition of sampled value
3069 Relax rules for $global_clock resolution
2328 Review and relax restrictions on data types in assertions
3113 Add port_identifier to constant_primary BNF for sequences, properties
3206 Deferred assertions are sensitive to glitches
3295 need a way to control only asserts/covers/assume directives
sv-bc
3608 Resolution of dotted names needs to mention parameters and nets
1067 out-of-range or x/z index to array of reals
sv-cc
3192 37.8 section has wrong value definitions for vpiAccessType
1653 Cannot get to class defn from VPI class typespec
1352 VPI 27.37 "Multiclock sequence expression" error
3022 Annex I import/export reversals
3772 vpiParameter label is missing in first diagram in "37.2 Parameter,
1649 Undefined possibly redundant VPI constraint object types
3423 No way in VPI to trace instance-array connections across
sv-dc
<none>
sv-ec
2845 virtual interface type checking versus interface type that had been
3230 task should be function in definition of static functions
2505 class select: what is allowed after the dot?
3278 virtual method type rules
2506 Non-trivial coverage space shapes and joint conditions are difficult
2987 Soft Constraints
3028 constraints for unique array elements.
1356 Multiple inheritance
In addition to those, the sv-cc has permission to work on any vpi changes
that might be required for: 3001, 2987 , 3724, 1356
2. The schedule is as follows
The following rigid schedule was put in place. Be aware that the
US Thanksgiving Holiday falls into this time frame. The expectation
from the Working Group is that the Technical Committees will be able to
find a way to meet this new schedule.
Nov 1 - Champions email vote ends
Nov 11 - Technical Committees done responding to Champions
Nov 16 - Champions vote done
Nov 23 - Technical Committees done responding to Champions
Nov 30 - Last Champions vote
Dec 1 - Working Group meets
Neil
-- This message has been scanned for viruses and dangerous content by MailScanner, and is believed to be clean.Received on Tue Nov 1 15:50:20 2011
This archive was generated by hypermail 2.1.8 : Tue Nov 01 2011 - 15:50:32 PDT