Issue #266 - Negative vote from Entity #6 - Version #2 Cliff-notes - Version #2 I have examined and proposed more fixes for normative notes. The process is still not complete. I have copied all of the appropriate text that needs to be examined and have proposed fixes for all of the sections through 24.4.3. All of the sections after 24.4.3 still need to be completed. The proposals at this time are just a duplicate of the original text, which will make it easier for me to modify to form proposals. I must catch a flight on Monday afternoon and will be tied up teaching a class all week. I will try to continue working on these corrections from my hotel but I cannot guarantee completion at this time. Regards - Cliff Cummings ---------------------------------------------------- Cliff Cummings - Sunburst Design, Inc. 14314 SW Allen Blvd., PMB 501, Beaverton, OR 97005 Phone: 503-641-8446 / FAX: 503-641-8486 cliffc@sunburst-design.com / www.sunburst-design.com Expert Verilog, SystemVerilog, Synthesis and Verification Training
This archive was generated by hypermail 2.1.8 : Mon Apr 11 2005 - 00:25:32 PDT