[sv-ec] fork join proposal


Subject: [sv-ec] fork join proposal
From: Francoise Martinolle (fm@cadence.com)
Date: Mon Feb 03 2003 - 06:21:22 PST


A comment

In the fork join proposal, there are now 2 ways to create a fork join with the
previous Verilog semantics. For example with option 2 fork join_all and
fork join
are 2 ways to create a fork-join all.

we could get rid of the all and -1 so that we use the Verilog fork join
because it is
already the way people use it and I doubt they will be using it with adding
"all".

At 02:20 PM 1/31/2003 -0800, David W. Smith wrote:

>There will be an extra meeting for the SV-EC committee from 11:00am until
>1:00pm PDT on Monday 3 February 2003.
>
>Meeting will start promptly at 11:00am and may run over in order to
>complete review of all three chapters.
>
>Dial in Information
>
>* PARTICIPANT CODE: 516134
>* Toll Free Dial In Number: (877)233-7845
>* International Access/Caller Paid Dial In Number: (505)766-5458
>
>Agenda
>
>1. Review and approve minutes from Jan 27 meeting
>2. Review and resolve email voting results (CH-34 and CH-36 in particular,
>see attached)
>3. Review open Action Items (see Action Item list at
><http://www.eda.org/sv-ec/ActionItems.html>http://www.eda.org/sv-ec/ActionItems.html)
> Items AI-1, 2, 4, 5, 8, 9, 10, 12, 13, 14, 15, 16, 41 have been
> closed with new change requests as appropriate.
>4. Approve Changes:
> CH-23, CH-33, CH-43, CH-59, CH-66, CH-67, CH-70 through CH-82
> These are all either changes done before Draft 2 or the result of
> action items that have been completed.
> The vote will be done as follows:
> a. Request any issues with the listed changes
> b. For those changes with no issues they will be voted on as a group
> c. For those changes with issues they will be discussed and
> resolved (with either vote or a change to the item).
>
>4. Vote on process/thread spawning options: 2 items to vote on (See
>attached document)
>5. Review LRM
> a. Review 10.1, 10.3.2, 10.4, 10.5, 11, 12
> b. Vote on acceptance of Chapters 1-11, 12 (with condition that all
> relate action items will be approved)
>
>6. Address any other issues before committee
>For the rest of the review process discussion will be limited to the
>following items:
>clarification
>problems
>solutions to clarification and problems
>No new proposals will be entertained.
>
>A copy of the LRM is available at:
>
><<http://www.sutherland-hdl.com/download/SystemVerilog_3.1_draft1.pdf>http://www.sutherland-hdl.com/download/SystemVerilog_3.1_draft1.pdf>
>
>http://www.sutherland-hdl.com/download/SystemVerilog_3.1_draft1.pdf
>
>Please review the information available on the website:
> <<http://www.eda.org/sv-ec>http://www.eda.org/sv-ec>
> http://www.eda.org/sv-ec.
>
>David W. Smith
>Synopsys Scientist
>
>Synopsys, Inc.
>Synopsys Technology Park
>2025 NW Cornelius Pass Road
>Hillsboro, OR 97124
>
>Voice: 503.547.6467
>Main: 503.547.6000
>FAX: 503.547.6906
>Email: <mailto:david.smith@synopsys.com>david.smith@synopsys.com
>http://www.synopsys.com
>
>



This archive was generated by hypermail 2b28 : Mon Feb 03 2003 - 06:22:15 PST